Curtain-wall caps, cut and assembled.

Customer-supplied painted extrusions, cut to length and machined with countersunk side holes, then fitted with end caps for Flynn’s curtain-wall package.

Final pickup · July 2026

Illustrative exploded view of a curtain-wall cover cap, an end plate and fixing screws
Representative cap assembly. Illustration, not the project’s profile or shop drawing.

A finished curtain-wall cap still needs the right length, fixing details and end treatment before it can move to the next assembly stage. For Flynn’s CAMH Research Level 6 package, Canadian Metal Fabricators carried out that defined fabrication scope.

The starting point

Flynn supplied the painted extrusion stock, painted end caps and screws. Its package defined the finished lengths and side-hole details, with separate priorities for the releases.

The work

CMF cut the profiles to size, machined the specified countersunk side holes, and assembled the end caps using the existing screw chases in the extrusion. The scope combined part preparation and end-cap assembly.

The handoff

The work moved in priority batches, including a separate release for the backorder. Flynn confirmed the Priority 2 shipment reached site and the final Level 6 backorder was picked up on July 23, 2026. This case covers the cap fabrication package; the wider building project continued separately.

Inside the scope

  1. 01

    Cut to length

    Prepare the supplied painted cap profiles to the part schedule.

  2. 02

    Machine the fixing details

    Machine the countersunk side holes specified for the cap.

  3. 03

    Fit the end caps

    Assemble the supplied end plates and screws into the extrusion’s screw chases.

Have a similar package?

Quoting a similar cap package? Include the cut list, visible finish requirements, hole and countersink details, end-cap drawings, supplied hardware and quantities by release.

Discuss your extrusion package

CAMH’s public construction update identifies Level 6 curtain-wall work at the Temerty Discovery Centre, its research building. CAMH · May–June 2026 construction update ↗

Fabrication scope described here is CMF’s work for Flynn. Illustrations show representative parts.